Berger Strasse 10, 6912 Hörbranz, Österreich

+43 (0)664/75030923 faron korok seeds

exide charger fault codes

Fuses with an ampere rating of 30A or less are smaller and need fuse reducers when placed in a 60A fuseblock. During the initial three (3) years of charger warranty period, GNB will bear all parts and labor costs of such repair or replacement. SALES SERVICE RECYCLING TOLL FREE 1-888-563-6300 Champion is a registered trademark of Federal-Mogul Corporation GNB Industrial Power Motive Power GNB Industrial Power Motive Power Exide Technologies Chloride Motive Power 829 Parkview Boulevard Lombard, IL 60148-3249 U.S.A. Tel: 877.GNB.INFO Fax: 630.691.7869 8301 Keele Street Maple, Ontario Canada L6A 1T2 Tel: 905.669.9326 Fax: 905.669.7688 P.O. 4. All SCRFLX battery chargers can come with a factory installed fused JIC switch assembly option for extra protection of the operator. APPENDIX A: SCRFLX BATTERY CHARGERS. minutes OFF dEL time DELAY MODE, PRESS START BUTTON TO OVERRIDE. 7.2.2BATTERY WATERING OPERATION AND END OF CHARGE. Having trouble using the Discussion Forums? This Warranty Agreement entered into between GNB Technologies, "GNB", and the Original User in respect to GNB electric vehicle battery chargers for electric vehicle usage. 9.2 Momentary Remote and Stop Operation . Maintenance process If any shipping damage or partial loss is found, file a claim with the carrier without delay and take any necessary steps to protect your rights. USE COPPER-CLAD ALUMINUM, ALUMINUM OR 7.1 FAULT AND DISPLAY CODES. Any claimed defect is subject to GNB's inspection and judgment, after the defective product has been returned by the original user at its expense to GNBs designated point of shipment. For battery sizes not listed, contact your local GNB service representative. The Remote Stop / Equalize option is available for Z model chargers B and C cabinets, 6 36 cells only. hmo8r#x)tr^C Keep the manual in a s afe and c onvenient, It is advisable to thoroughly read the information on battery safety. It remains closed for approximately ten minutes. During this mode the charge status indicator will show indication 6 and the LCD display will show the Proper installation is important in order to achieve good charger performance and long troublefree operation and to prevent damage to the charger and batteries. Lead-acid battery safety precautions and storage instructions, Electric forklift battery repair work list, About battery forklift charging battery cover to open the problem. GNB shall not be obligated to reimburse the original user or any other person for any work performed. NOTE: The following applies to three phase chargers only: if the charger indicates FAC or F3 upon start-up, it means that there is a low or high AC voltage (+35%) or AC phase missing. Continue the AC wiring to fuseholder terminals L1 (N) and L2 (L) (single phase input) or L1, L2, and L3 (three phase input), ensuring that the AC source phases match the phase rotation on the AC input. WARNING: THE ABOVE PROCEDURES MUST BE FOLLOWED EXACTLY TO AVOID INJURY OR RISK OF ELECTRIC SHOCK. Before proceeding check which transformer tap configuration you have. Do not operate this unit if it has received a sharp blow, been dropped or otherwise damaged. During year four (4) of the warranty, GNB will only cover parts, no labor or travel will be provided by GNB. Regulation The finish rate is 4.5 amps for each 100 amp-hour size of the charger rating at 2.6 VPC (+/-1% with a line variation of +6/-10%). PAGE 1. have a minimum clearance overhead of eight, inches (8"), ensuring ventilation is not obstructed at the rear intake. The charger has a comprehensive self-checking diagnostic program to control all charger functions, monitor the quality of charge and check its own safety conditions. - 36.5 50 31.5 16 FUSE 40 20 AMPS AMPS C.F. The charger comes with a ground lug attached to the stud, clearly marked on the chassis. A 15.10 22.70 32.10 24.30 24.30 24.30 DIM. The charger does not, exhibit high in-rush current, therefore type B or C circuit breakers, CAUTION - To reduce the risk of fire, use only on circuits provided, with branch circuit protection consistent with the current indicated, on the rating label and i n accordance with the National Electrical, The circuit breakers rating should be bas ed on the chargers. The GNB SCR100 battery chargers are convection cooled, solid state, micro-processor controlled SCR regulated chargers designed to make battery charging simple. e)Only qualified personnel should operate or service this equipment. 8.2.2 VOLTS Release the UP or DOWN button to display the voltage per cell as: [ x.xx V]. 2.0 INTRODUCTION The GNB SCRFLX battery chargers are convection cooled, solid state, micro-processor controlled SCR regulated chargers designed to make battery charging simple. Given that we're at LogiMAT in Stuttgart, Germany, it's no surprise that this week's news has some European flavour. Login to open The stud is designed for a 3/16 hardware. After electrical connection is completed, the charger is ready for operation. They are designed to charge flooded lead-acid batteries only. Take it to a qualified GNB service center. CAUTION: USE MINIMUM 75C WIRING. SPP PowrPak Series Industrial Battery Chargers. (Note: When the main circuit is charging, the circuit board is completely disconnected, the charging process is not controlled, it can only be counted as time charging test, and can not be charged for a long time). NOTE: Use only identical replacement fuses obtainable from your GNB service representative. Except as authorized in writing, this warranty does not cover any equipment that has been repaired or modified by any party other than GNB. "), IMPORTANT OPERATING AND SAFETY INSTRUCTIONS, 9.1 SCRFLX Charger Functional Description, APPENDIX A: SCRFLX BATTERY CHARGERS. 1. Ensure that the 220V AC mains power supply has electricity and the link is reliable; the battery voltage is not lower than 20V (the charger will automatically protect and stop working below 20V). European Parliament last week passed the new EU Machinery Regulation. See applicable drawing 4770-65-73041-05, 4770-65-73041-15 or 4770-65- 73041-17 for electrical schematic (Appendix B, pages 21-31). 2. Subscribe Now to access Warranty Chargers have a 10-year warranty to the end-user. Continue the AC wiring to fuseholder terminals L1 (N) and L2 (L) (single phase input) or L1, L2, and L3 (three phase input), ensuring that the AC source phases match the phase rotation on the AC input. France is the most visited country in the world. The DC charging cable has a commonly used battery plug or receptacle. A JIC type switch can only be factory installed and it is available in a B, C or D size cabinet. Do not touch uninsulated parts of the DC output connector or the battery terminals, as there is a possibility of electric shock. See gounding method shown below (Figure 4.). PACIFIC CHLORIDE GNB Industrial Power Motive Power GNB Industrial Power Motive Power Exide Technologies Chloride Motive Power 829 Parkview Boulevard Lombard, IL 60148-3249 U.S.A. Tel: 877.GNB.INFO Fax: 630.691.7869 8301 Keele Street Maple, Ontario Canada L6A 1T2 Tel: 905.669.9326 Fax: 905.669.7688 P.O. The charger is used within the published performance rating for the unit involved. a)Before using the battery charger, read all the instructions in addition to the CAUTION, WARNING, and DANGER markings on the charger, battery and all the associated equipment. TABLE 2 SINGLE PHASE TECHNICAL DATA STANDARD MODEL SCRFLX-XX-XXXX-S1Z DC AC AMPS @ AC VOLTS AMPS SCRFLX-06-260S1Z SCRFLX-06-475S1Z (50 Hz) SCRFLX-06-600S1Z (50 Hz) SCRFLX-06-865S1Z SCRFLX-06-965S1Z SCRFLX-09-475S1Z SCRFLX-09-600S1Z SCRFLX-09-865S1Z SCRFLX-09-965S1Z SCRFLX-12-260S1Z (50 Hz) 40 74 74 93 93 134 150 74 93 134 150 40 40 SCRFLX-12-475S1Z 74 (50 Hz) SCRFLX-12-600S1Z (50 Hz) SCRFLX-12-750S1Z SCRFLX-12-865S1Z SCRFLX-12-965S1Z SCRFLX-18-260S1Z SCRFLX-18-475S1Z Instr. Box 1, Salford Road Over Hulton, Bolton BL5 1DD United Kingdom Tel: 44.1204.661.230 Fax: 44.1204. - B 220 10 15 9 12 5 7 C.F. Examine the charger thoroughly before using, to make sure that no parts have been loosened or damaged during shipment. b)Do not touch uninsulated parts of the DC output connector or the battery terminals, as there is a possibility of electric shock. %PDF-1.6 % All SCR100 battery chargers can come with a factory installed fused JIC switch assembly option for extra protection of the operator. 7.2.2BATTERY WATERING OPERATION AND END OF CHARGE. i)Do not operate this unit if it has received a sharp blow, been dropped or otherwise damaged. Do not operate this unit if it has received a sharp blow, been dropped or otherwise damaged. DELAY CIRCUIT CAUTION: HAZARDOUS VOLTAGES INSIDE. 299 0 obj <>/Filter/FlateDecode/ID[<4334B8E94645554495867010547383D1>]/Index[278 41]/Info 277 0 R/Length 100/Prev 768261/Root 279 0 R/Size 319/Type/XRef/W[1 2 1]>>stream If the battery is unplugged during charging, the charger will indicate OFF. a)Before using the battery charger, read all the instructions in addition to the CAUTION, WARNING, and DANGER markings on the charger, battery and all the associated equipment. It can be inferred that the charger fault is caused by the control board. If the battery is unplugged during charging, the charger will indicate OFF/FCA. Fuses with an ampere rating of 30A or less are smaller and need fuse reducers when placed in a 60A fuseblock. Verify connection of primary windings of power transformer and AC fuses of charger per connected AC voltage and electricians tag. Chargers | Exide Chargers What are Chargers? "A%i_ 4]Y8xA)DPFc(9a@)JJI}Hxvxq%Qh1WZ"&8;$skmZe'h7+|FF3_pMpA&(%:t0l=w]; WARNING: IMPROPER WIRE AND JUMPER CONNECTION MAY CAUSE SEVERE DAMAGE TO THE CHARGER AND BATTERY, 120 VAC CONFIGURATION (120/208/240V INPUT), 208 VAC CONFIGURATION (208/240/480V INPUT), 208 VAC CONFIGURATION (120/208/240V INPUT), 240 VAC CONFIGURATION (208/240/480V INPUT), 240 VAC CONFIGURATION (120/208/240V INPUT), 480 VAC CONFIGURATION (208/240/480V INPUT), 208VAC CONFIGURATION (208/240/480V INPUT), 240VAC CONFIGURATION (208/240/480V INPUT), 480VAC CONFIGURATION (208/240/480V INPUT), 208VAC CONFIGURATION (208/240/480V INPUT) (SCRFLX- XX-XXXXT1Z ONLY), 240VAC CONFIGURATION (208/240/480V INPUT) (SCRFLX -XX-XXXXT1Z ONLY), 480VAC CONFIGURATION (208/240/480V INPUT) (SCRFLX -XX-XXXXT1Z ONLY). The charger is warranted for four (4) years from the date of manufacture as determined by the product serial number, with the following exceptions: 3.1Power transformers, SCR's and silicon diodes are warranted for ten (10) years from the date of manufacture of the charger(s) of which they are a part. For the first they are displayed when no battery is connected. The DC charging cable has a commonly used battery plug or receptacle. Do not expose the charger to rain or snow. For non Z models contact your local GNB service representative. If any shipping damage or partial loss is found, file a claim with the carrier without delay and take any necessary steps to protect your rights. Examine the charger thoroughly before using, to make sure that no parts have been loosened or damaged during shipment. LIST OF DISPLAY INDICATIONS, APPENDIX B: ELECTRICAL SCHEMATIC DRAWINGS, SCRFLX SERIES INDUSTRIAL BATTERY CHARGERS, 1.0 IMPORTANT OPERATING AND SAFETY INSTRUCTIONS. Do not connect the next battery before you see indication OFF/FCA. Incorrect re-assembly of the charger may result in an explosion, electric shock or fire. Once finished, refer to Table 2 (pages 9-10) for the correct size of AC input fuses. 10. more great content like this. 7.2 Options 8. To permit free air flow for convection cooling allow four inches minimum between the charger and any wall, six inches from other equipment, and never store anything beneath or on top of the charger.

Purdue Alumni Apparel, Articles E